deschuttes ccb

Deschutes Ave. and Columbia Center Boulevard Intersection Improvements

Location: Kennewick, WA

Date: May 2024

Details:

This project consists of constructing a new traffic signal system to accommodate a new right-turn lane for turning capacity for west-bound traffic turning northbound onto Columbia Center Blvd. Installed roundabout at Colorado St. and Deschutes Ave.  Installed curb, gutter, sidewalk,  traffic curbing, concrete traffic islands, retaining walls, driveways, storm drainage, utility trench excavation, landscape and irrigation restoration, HMA patching and overlay, striping, signage and a new signal system. Along Deschutes Ave the entire intersection at Columbia Center Blvd and at Colorado St. was overlaid with hot mix asphalt and restriped.